Onpolar · IT services & agencies

Onpolar runs a consultancy from enquiry to invoice in one system

An Estonian product development studio where proposals, clients, monthly invoicing and the studio's own hardware all sit on one set of records.

Client
Onpolar
Location
Estonia

The studio

Onpolar is an Estonian product development studio: senior engineers building AI-native SaaS for clients, from MVP to production. The work is project-shaped — scoped, quoted, delivered, billed — and like most studios of its size, the commercial half of it used to live across a set of documents, a spreadsheet and somebody's memory.

Proposals start life as leads

Consulting work arrives as conversations — a form on onpolar.com, a referral, an intro call. Each one goes into the pipeline as a lead with its source recorded, and moves through the stages a studio actually has: enquiry, scoping, proposal sent, won or lost. The notes on the record hold what was discussed and what was promised, so a proposal written two weeks later starts from the record, not from memory.

Clients are records, not folders

A won proposal converts to a customer record, and everything after that attaches to it: the quotes that scoped the work, the invoices that billed it, the notes that explain it. When a client comes back a year later, the whole relationship is one screen — what was built, what was billed, what was said.

Invoicing that matches how studios bill

Project work bills monthly. Each invoice goes out from the client's record with line-level VAT and the studio's details on the PDF, and lands in the income view next to the expenses the month actually cost — software, subcontractors, hardware. The gap between billed and spent is visible without exporting anything into a spreadsheet.

The hardware is in the register

Workstations, test devices, the machines the studio develops on — each sits in the fixed-asset register with its purchase date and value. It's the unglamorous part of running a company, which is exactly why it belongs in the same system as everything else instead of in a document nobody updates.

Why this loop matters

A consultancy's whole commercial life is a loop: enquiry → proposal → client → invoice → repeat. Onpolar runs that loop daily with the studio's own books beside it — so the question every studio owner eventually asks, which clients are actually worth the calendar space, gets answered from the records rather than from instinct.

What the replaced tools would cost

€2,000+

What a 5-person team keeps per year against the separate tools this story replaces — at the calculator's typical figures.

Get started

Start free. Scale as you grow.

Run your whole business in one place — and pay for it like a founder, not an enterprise.

  • Start free
  • Setup in minutes
  • No trial clock